NDS_2

Voroshilovskiy bridge

Bridge over the Don river in Rostov-on-Don.

Commissioning date: 9.10.1965.

Total length of the bridge – 450 meters.

The superstructures of the bridge are equipped with a sub-system for stress-strain state monitoring from the scope of ZETLAB structural health monitoring system.